YUNDY
Open menu

RFQ & Project Preparation

RFQ Preparation Guide

A practical guide for preparing polyurethane foam and converted foam component RFQs, covering project background, drawings, material requirements, processing methods, volume, compliance, and delivery information.

YUNDY | 2026-05-28

Better RFQ information shortens project review

This practical guide helps customers prepare polyurethane foam and converted foam component RFQs, including project background, drawings, material requirements, processing methods, volume, compliance, packaging, and delivery information.

RFQ Information at a Glance

  • Project background
  • Drawing or sample photo
  • Dimensions and tolerance
  • Material performance
  • Processing method
  • Application environment
  • Annual volume
  • Compliance needs
  • Packaging and delivery

Basic Project Information

  • Company name
  • Contact person
  • Country / region
  • Industry
  • Application
  • Project stage
  • New project, replacement material, cost-down project, or production supply request

Product and Drawing Information

  • Drawing, 2D/3D file, or sample photo
  • Target size and tolerance
  • Thickness
  • Shape and edge requirements
  • Assembly position
  • Color
  • Surface condition
  • Packaging method

Material Requirements

Material targets

  • Foam type if known
  • Density
  • Hardness
  • Rebound
  • Compression performance
  • Compression set

Practical note

If the material is not defined, describe the application and target performance so YUNDY can suggest a starting range.

Functional requirements

  • Flame retardant requirement
  • Odor requirement
  • Temperature or humidity exposure
  • Anti-static, filtration, sealing, acoustic, or cushioning requirement if applicable

Processing Requirements

  • Sheet cutting
  • Slitting
  • Die-cutting
  • Punching
  • Lamination
  • Adhesive backing
  • Custom-shaped processing
  • Assembly or kitting if applicable

Application Environment

  • Automotive interior
  • NVH
  • Electronics protection
  • Packaging cushioning
  • Filtration
  • Polishing and cleaning
  • Medical / healthcare-related
  • Industrial cushioning or sealing

Commercial and Supply Information

  • Annual volume
  • Estimated order quantity
  • Batch schedule
  • Target lead time
  • Sample quantity
  • Packaging requirement
  • Delivery destination
  • Incoterms if known
  • Target price if available

Compliance and Documentation

  • IATF / ISO supplier qualification needs
  • RoHS / REACH if applicable
  • Customer-specific documentation
  • Material data sheet
  • Test report
  • Certificate or supplier audit document request

What if the Specification is Incomplete?

If a complete specification is not available yet, customers can still start with the application scenario, reference sample, current problem, target performance, approximate size, and estimated annual volume. YUNDY can help with preliminary material selection and sample discussion.

RFQ Summary Checklist

  • Drawing or sample photo
  • Size and tolerance
  • Material or performance target
  • Processing method
  • Application and assembly position
  • Annual volume
  • Compliance requirement
  • Packaging and delivery requirement

Key Takeaway

A complete RFQ helps shorten evaluation time, improve quotation accuracy, and reduce back-and-forth communication.